Eishin Campus – High School: Auxiliary Buildings

1986 to 1989
Nihongi 112-1, Iruma-shi, Saitama Prefecture, Japan
Educational, Realized , Construction completed in 1989
There is a number of auxiliary buildings in the campus, the largest of them being the maintenance building along the entrance street.
Client:
Higashino High School - Hisae Hosoi, Managing Director
C.E.S. staff:
Christopher Alexander, Hans-Joachim Neis, Gary Black, Ingrid Fiksdahl-King
Contractor:
Center for Environmental Structure, Japan
Project stages:
Layout on the site by clients and C.E.S. Design Development and Construction Drawings done after layout Construction management along with on-site design decisions
Content of