Rapid Transit Stations for the Bay Area Rapid Transit System: Preliminary Design Drawings

23/06/1964
Architectural Design, Preliminary Design, Diagrams, Details, Notes

System 40 – “Safety at the Barrier” deals with the overall height and degree of openness of the barrier wall from the standpoint of safety of passengers waiting near the platform edge.