Civic Center and Town Hall for Mountain View: Preliminary Cost Estimate
09/09/198630-page study includes: 1) An introductory letter indicating the content’s compliance with the competition conditions and specifications, calculated in accordance to the instructions provided by Christopher Alexander. It is a detailed take-off and estimate reflecting the drawings provided, with all the proposed unusual design elements and nonstandard construction techniques; 2) Area tabulation detailing quantities of areas of construction; 3) Cost Estimate Summaries; 4) Analytical cost estimate sheets, Two draft estimates are included.
References
-
Civic Center and Town Hall for Mountain View: Cost estimate
01/08/1986
22-page document with estimates which try to offset the increased costs of numerous special building details in some areas, with proposals for much simpler construction and materials in other areas. Estimates given include site works and finish details, buildings and ...
-
Civic Center and Town Hall for Mountain View: Estimate summaries for cost and areas
25/08/1986
18-page handwritten draft summaries of costs and areas. Organized in two parts: 1. 14 pages with costs for the parking garage structure, cladding, interiors, services, miscellaneous and site; 2. 4 pages with the quantities for the square feet of horizontal ...