Neighborhood of Seventy Low Cost Houses: Infrastructure Reports – Geotechnical and Power Supply studies
01/04/1988Two studies for the public area’s infrastructure followed by the approval of the General Municipal Office of Public Works: The first is a 22-page soil analysis specifying types of foundation possibilities and the requirements for installing the main sewage lines; and the second a 4-page study regarding requirement of the public electrical lines.
Contents