Berryessa House: Foundation concrete works – Photographs
9 9) Overview of the living room-kitchen and studio terraces with the connecting staircase

01/02/1982
Layout Process on Site, Construction Process

Nine images of the poured concrete slabs and retaining walls with the formwork still in place and the white styrofoam pads highlighting the rebars sticking out. At this point, the design decisions made during the layout process on the land have been realized in concrete terms.

Photograph:

References
SEE ALL Photographs