Berryessa House: Foundation concrete works – Photographs
4 4) Detail of perimeter foundation beam with an embedded tile

10/02/1982
Layout Process on Site, Construction Process

Four images of the concrete slabs and retaining walls after the formwork had been removed. In some of them the blue tiles embedded in the perimeter slab beam can be discerned.

Photograph: