LaMar-Price House: Referring to two versions of preliminary construction budget, attached to the letter One version is the “basic” version and the other is a “Full version. both dated 2/21/1994
22/02/1994LaMar-Price House: Referring to two versions of preliminary construction budget, attached to the letter One version is the “basic” version and the other is a “Full version. both dated 2/21/1994
22/02/1994