Invoice for work hours spent on design and engineering studies on three different projects
21/06/1994
References
-
Eishin Campus - High School
1982 to
1995
The High School is the part of the Eishin Campus that was constructed, with a total construction area of 12,000 square meters. It is a complex of thirty-five buildings, with pedestrian colonnaded streets, gates and gardens, and a lake with ...
-
House and Spiritual Retreat for Mary LaMar
1993 to
1995
Vacation house overlooking Tomahawk Lake, on a site with pronounced slop and existing cottage. The wish of the client, to preserve part of the cottage, was seriously considered and it was incorporated successfully into the design of the new house. ...