Memorandum: BART requirements
01/01/1964
References
-
Bay Area Rapid Transit: Review of System Solutions
02/04/1964
100-page report listing and analyzing design problems in the BART stations, organized in 73 related systems, with proposed solutions; it is followed by the list of the 390 requirements for the Transit Station, grouped as per the proposed systems .
-
Bay Area Rapid Transit: 390 Requirements for the Rapid Transit Station
01/01/1964
40-page report listing the 390 requirements the Rapid System Transit Station should cover, organized in thirty-three groups; all leading to a safer and more adequate functionally environment. A 37-page draft with numbering variations of work priorities is also included .