Herman Miller New Office Furniture System: Gratitude for payment of expense bill
06/01/1990
Financial,
Services Fee
Sender:
Christopher Alexander, Center for Environmental Structure, Berkeley, CA, U.S.A.
Recipient:
Ann Schippers, Herman Miller Inc., Zeeland, MI, U.S.A.
Medium:
Letter
Content of
Project
The Personal Workplace - New System of Office Furniture
1988 to 1990
Zeeland, MI, U.S.A.
Office Furniture,
Designed
, Two personal offices with furniture prototypes built by C.E.S.
Client:
Herman Miller, Inc. - Rob Harvey, Vice President
C.E.S. staff:
Christopher Alexander, Artemis Anninou, Gary Black
Design and construction process:
Theree design principles guided the development of the project: 1) Layout of the personal work space by their users in order to meet their own personal needs; this process is achievable through the use of a computer program developed at C.E.S. which carries a worker through the design process. 2) Use of flexible manufacturing techniques, which allow individualisation of each piece of furniture, without increasing costs; the purpose of this feature is to eliminate the modularity that is part and parcel of current systems. 3) The basis of design is the real human needs and desires, not on the latest trend.
Project stages:
Generic rules for office layout process Use of full scale mock-ups Fabrication of full size furniture prototypes and office rooms by C.E.S. Design Development drawings done after fabrication
Herman Miller, the second largest manufacturer of office furniture in the United States, commissioned C.E.S. to develop the "personal workplace", a new system of furniture, which aimed at changing the nature of the American workplace completely. The emphasis was on ...
References
Correspondence
Herman Miller New Office Furniture System: Discussing the impossible financial situation created the interference of Rob Harvey in this area and the inability of Merman Miller to control that. Asking for a solution to the overhead factor proposed by the Center for Environmental Structure, so that the business relationship could continue; two drafts are included
08/11/1989
Project,
Financial,
Request for Payment
Sender:
Christopher Alexander, Center for Environmental Structure, Berkeley, CA, U.S.A.
Recipient:
Jim Bloem, Herman Miller Inc., Zeeland, MI, U.S.A.
Medium:
Letter