LaMar-Price House: Handwritten note to Christopher Alexander referring to site plan adjustments and clients’ initial reaction to the new building new stake out
16/09/1994
References
-
LaMar-Price House: Preliminary Design Drawings - Building layout on site
30/08/1994
CA’s Version 30-Aug-1994 is noted on the drawing. Christopher Alexander’s revised proposal of the building layout staked on site, overlaid with thick continuous line above the initial layout.
-
LaMar-Price House: Preliminary Design Drawings - Building layout on site
17/09/1994
Serpentine Version 2, dated 17-Sep-1994 is noted on the drawing. Christopher Alexander’s second revised proposal of the building layout staked on site, overlaid with thick continuous line above the initial layout.
-
LaMar-Price House: Photographs of layout process on the land
01/09/1994
Eleven images depicting the staked-out area of the lot.
-
LaMar-Price House: Photographs of layout process on the land
14/09/1994
Nine photographs of the “C.A.” stake-out version; some photos are taped together to show panorama and full height of trees.