Eishin Campus – High School: Providing information on the bank accounts where the specified amount of fees should be deposited. Also requesting a signed copy of a previously initialed memorandum. A draft of the final architect’s report will be soon sent in accordance with the construction contract; with wishes for continuation of this positive state of the project
01/03/1985
References