Eishin Campus – High School: Transmitting a draft of a 3-page cost breakdown with estimates for: Design work in California and Japan, direct expenses, job estimate, overhead and its distribution between California and Japan, and schedule of payments in relation to the design and construction of 4 new classrooms. Letter includes a summary of the factors considered for the calculations, and a request for discussing the Japanese preface to the Production of Houses translation

06/06/1990
Financial, Cost Estimate
Sender:
Christopher Alexander, Center for Environmental Structure, Berkeley, CA, U.S.A.
Recipient:
Hiro Nakano, Center for Eishin Project, Musashino City, Tokyo, Japan
Medium:
Fax
Content of