Eishin Campus – High School: Parents Clubhouse: Design Development Drawings – Site Plan
17/02/1995Computer produced drawing of the clubhouse building and various site development details of structures in connection to building and its surroundings.
References
-
House and Spiritual Retreat for Mary LaMar: Drawings - Preliminary Drawings - Floor plans
08/09/1993
Three pencil drawings of the three levels of house floor plans. .
-
Eishin Campus - High School: Parents Clubhouse: Preliminary Design Drawings - Site Plan
25/05/1994
Computer produced drawing of the clubhouse building palced on the site; depicting its spatial relation to existing structures.