Rapid Transit Stations for the Bay Area Rapid Transit System: Preliminary Design Drawings
23/06/1964System 40 – “Safety at the Barrier” deals with the overall height and degree of openness of the barrier wall from the standpoint of safety of passengers waiting near the platform edge.
References