Rapid Transit Stations for the Bay Area Rapid Transit System: Preliminary Design Drawings
23/06/1964System 40 – “Safety at the Barrier” deals with the overall height and degree of openness of the barrier wall from the standpoint of safety of passengers waiting near the platform edge.
References

Go Back