Rapid Transit Stations for the Bay Area Rapid Transit System: Preliminary Design Drawings

23/06/1964
Architectural Design, Preliminary Design, Diagrams, Details, Notes

System 49 – “Cleaning and Litter Removal” specifies, generally through the station, the manner in which litter is generated and the means provided for its efficient disposal.