Sweet Potatoes Offices and Workshops: Thick Wall with Three Panels – Design Development Drawings
01/03/1985Thick wall made of three panels, with drawers, shelves, counter, cupboards, and small compartments at the top, as built-in elements, installed at the end part of the long wall of the production room of Sweet Potatoes. Ten pages with pencil dimensioned hardline and free hand drawings, with overall elevations and referenced sections with details.
Contents
-
Sweet Potatoes Offices and Workshops: Thick Wall with Three Panels - Design Development Drawings
01/03/1985
-
Sweet Potatoes Offices and Workshops: Thick Wall with Three Panels - Design Development Drawings
01/03/1985
-
Sweet Potatoes Offices and Workshops: Thick Wall with Three Panels - Design Development Drawings
01/03/1985
SEE ALL Drawings
References
-
Offices and Workshops for Sweet Potatoes Children's Clothing Factory: Photographs of building interior before being painted
01/04/1986
Two general views of the central production room, after the completion of wood works, before it was painted, and two more views of focusing on details of a thick wall and the wall frieze.
-
Sweet Potatoes Offices and Workshops: Thick Walls - Photographs
01/01/1985
Three photographs of various types of thick walls, fabricated in the C.E.S. workshop and moved to the project site, ready to be installed.
-
Sweet Potatoes Offices and Workshops: Thick Wall made of three panels, with drawers, shelves, counter, cupboards, and small compartments - Photographs
01/01/1985
Seven partial views of the thick wall and its panels, installed in the end part of the long wall of the production room, focusing on its various built-in elements, and depicting various stages towards completion of the construction.