Berryessa House: Foundation perimeter beam, slab and retaining walls formwork – Photographs
7 7) Overview of top boards showing the levels of entrance, stair landing studio and living room

01/07/1981
Layout Process on Site, Construction Process

Seven views from the construction process of the foundation formwork, and specifically nailing the top board of the ground floor slab on metal stakes, and hamemering the stakes into the ground until the proper level was reached. A design decision was made at that point to define the ground floor level of the main volumes of the house, in relationship to the slopes and in relationship to each other, incorporating at the same time the maximum benefit from the views between trees.