Berryessa Terraced House: Foundation concrete works – Photographs

01/02/1982
Layout Process on Site, Construction Process

Nine images of the poured concrete slabs and retaining walls with the formwork still in place and the white styrofoam pads highlighting the rebars sticking out. Two views are from the entrance slab; two from the studio slab; two from the living room and kitchen slab; two from the bedroom and library slabs; and the last one an overview. At this point, the design decisions made during the layout process on the land have been realized in concrete terms.