01/01/1988Filling in the space between the timber posts, and between windows with stud framing, placing thermal insulation, waterproofing and building paper, while covering all timber outside surfaces with the same. The final outside layer is the wire mesh for being embedded in the gunite. Seven images show various stages of this construction phase.
Contents
-
Berryessa Terraced House: Preparation for shooting the gunite - Construction of walls - Photographs
01/01/1988
-
Berryessa Terraced House: Preparation for shooting the gunite - Construction of walls - Photographs
01/01/1988
-
Berryessa Terraced House: Preparation for shooting the gunite - Construction of walls - Photographs
01/01/1988
SEE ALL Photographs
References
-
Berryessa Terraced House: Foundation concrete works - Photographs
10/02/1982
Four images of the concrete slabs and retaining walls after the formwork had been removed. In some of them the blue tiles embedded in the perimeter slab beam can be discerned.
-
Berryessa Terraced House: Timber framing detail - Photographs
01/01/1988
Two images of connections between 6″x6″ Douglas fir posts and 6″x8″ Douglas fir main beams and 4″x6″ secondary beams through shaped doweled corbels.
-
Berryessa Terraced House: Deciding on spacing and size of windows - Photographs
01/01/1988
Five images of mock-ups for the living room windows for shaping them in relationship to each other and in relation to the space between them. The first depicts the alcove windows, the next two the windows towards the veranda and ...