Berryessa Terraced House: Preparation for shooting the gunite – Construction of walls – Photographs

01/01/1988
Construction Process

Filling in the space between the timber posts, and between windows with stud framing, placing thermal insulation, waterproofing and building paper, while covering all timber outside surfaces with the same. The final inside layer is built with 1″x18″ pine planks placed between the posts. Two images show this construction phase.

Photographer:
Artemis Anninou/C.E.S., Napa County, CA, U.S.A.
Source:
Slide
Characteristics:
Color
References
SEE ALL Photographs