C.E.S. Office – Martinez House: Photographs of Architecture students having a meeting with Christopher Alexander
01/05/1986A group of architecture students in the C.E.S. office in Martinez, enjoying lunch on the grass with Christopher Alexander and his colleagues. Seven photographs showing moments of talking, eating and playing.
Content of
-
C.E.S. Office - Martinez House
1977 to
1984
The second building completed on the Martinez site, was a 2,000 square feet house. A gunite all-concrete building as well, it was the first sizable and fully functional project in which C.E.S. used gunite, while applying all permit and specification ...
-
Tile Glazing Workshop
1978 to
1981
The first building completed on the Martinez site, was an experimental gunite all-concrete building, with 200 square feet of floor area, concrete vaulted ceiling and concrete pitched roof. It was used as the tile glazing workshop, equipped with a kiln ...
Contents
-
C.E.S. Office - Martinez House: Photographs of Architecture students having a meeting with Christopher Alexander
01/05/1986
-
C.E.S. Office - Martinez House: Photographs of Architecture students having a meeting with Christopher Alexander
01/05/1986
-
C.E.S. Office - Martinez House: Photographs of Architecture students having a meeting with Christopher Alexander
01/05/1986
SEE ALL Photographs
References
-
Civic Center and Town Hall for Mountain View: Board 2 - The plaza and main public spaces
01/07/1986
Three draft pages laying out the key design factors and aspects of the main plaza and the other public spaces for the new Civic Center; presented with illustrations on the second presentation board. One more draft included.
-
Civic Center and Town Hall for Mountain View: Board 5 - The Theater
01/07/1986
One draft page laying out the key design factors and aspects of the Theatre building for the new Civic Center; presented with illustrations on the fifth presentation board. One more draft included.
-
Civic Center and Town Hall for Mountain View: Mock-up text
01/07/1986
Five mock-up pages with the final text to be used on the five presentation boards for the Site Plan, the Theatre, the Visualization Process, the Plaza and Main Public Spaces, and the City Hall.