C.E.S. Office – Martinez House: Experimental gunnite all-concrete building; Photographs of construction stages

01/01/1983
Construction Process

Four photographs of the same wall shot in a period of eigtheen months, depicting the sequential construction stages of building the wall with gunite; on the first photo the thermal insulation is in place, on the second the waterproofing and mesh have been fastened, on the third the concrete has been sprayed and on the fourth the wall has been painted.
The last photograph shows the whole house just after the shooting of the gunite was completed. It exhibited at the Locus Manifesto-exposition “Re-enchant the World: Architecture and the City facing society´s transitions”, in Science Cabinet 2.

Photographer:
Christopher Alexander/C.E.S., Martinez, CA, U.S.A.
Source:
Digital, Slide
Characteristics:
Color
References