C.E.S. Office – Martinez House: Experimental gunnite all-concrete building; wall framing – Photographs
01/08/1982Four photographs from the stage of constructing the wood framing of the walls. The first image shows the mock-up of window openings on the lath of the wall, while on the second the framing of the windows has been completed. The third image depicts a small portion of a wall completed with its thermal insulation and the last one shows the low cost light guidework of the wall.
Contents
-
C.E.S. Office - Martinez House: Experimental gunnite all-concrete building; wall framing - Photographs
01/08/1982
-
C.E.S. Office - Martinez House: Experimental gunnite all-concrete building; wall framing - Photographs
Low cost guidework
01/08/1982
-
C.E.S. Office - Martinez House: Experimental gunnite all-concrete building; wall framing - Photographs
Lightness of low cost guidework
01/08/1982
SEE ALL Photographs
References
-
C.E.S. Office - Martinez House: Experimental gunnite all-concrete building - Photographs
01/01/1981
Nineteen photographs depicting the construction of the 1st stage formwork for the vertical elements of the building, namely the formwork for: a) the outer surface of the six outer corner columns of the building volumes, b) the two short wall ...
-
C.E.S. Office - Martinez House: Experimental gunnite all-concrete building; formwork for vertical elements - Photographs
01/01/1981
One close up view of the front porch formwork, two more images depicting the front end house formwork, and one more showing the whole house formwork extending on its long side.
-
C.E.S. Office - Martinez House: Experimental gunnite all-concrete building; Photographs of construction stages
01/01/1983
Four photographs of the same wall shot in a period of eigtheen months, depicting the sequential construction stages of building the wall with gunite; on the first photo the thermal insulation is in place, on the second the waterproofing and ...