Christopher Alexander Ces Archive
  • Home
  • Christopher Alexander
  • Center for Environmental Structure
  • Publications
  • Projects
  • Works of Art
  • Construction Innovations
  • Academic
  • Scientific Research
  • Public Events
Photograph
Go Back

C.E.S. Office – Martinez House: Photographs of foundation construction works

01/01/1979
Construction Process

Seventeen images depicting concrete pouring works. They depict preparations for pouring concrete, and the completion of the first slab pour on the entrance porch.

Photograph:

  • 1) Getting ready to start pouring concrete
  • 5) Christopher Alexander with a hose on the entrance porch slab
  • 6) Alexander shoots the final concrete layer on the entrance porch slab
  • 7) Close-up of Alexander shooting concrete
  • 9) Herman Diedrich shooting concrete in the slab next to that of the porch
  • 12) Christopher Alexander looking at the screeded slab
  • 13) Christopher Alexander & Herman Diedrich close to completing the screeding of the slab
  • 15) Christopher Alexander & Herman Diedrich start removing the formwork
  • 16) Alexander paying attention at the connection between perimeter foundation beam and slab
Content of
  • C.E.S. Office - Martinez House 1977 to 1984
    4207 Arthur Road, 94553, Martinez, CA, U.S.A.
    Residential, Realized , Construction completed in 1984
    The second building completed on the Martinez site, was a 2,000 square feet house. A gunite all-concrete building as well, it was the first sizable and fully functional project in which C.E.S. used gunite, while applying all permit and specification ...
References
  • Design and Construction is one Integrated Making Process
    The design process of a project and its construction process are united into one continuous and intertwined making process, unfolding in a step-by-step sequence. Design ends together with the completion of the construction process. "Making" is a conception of the ...
  • C.E.S. Office - Martinez House: Photographs of foundation construction works 01/01/1979
    Project, Construction Process
    Digitized
    Eight images of the foundation excavations works, and the formation of the different levels of the building.
  • C.E.S. Office - Martinez House: Photographs of foundation construction works 01/01/1979
    Project, Construction Process
    Digitized
    Twenty-five images of the foundation formworks. They depict various operations and elements of the formwork, like retaining walls, footings and perimeter beams, including both overviews and close-ups.
  • C.E.S. Office - Martinez House: Photographs of foundation construction works 01/01/1979
    Project, Construction Process
    Digitized
    Nine images of concrete works. They depict the completed first concrete slab pour of the entrance porch, showing the ornamental border, made by stamping the concrete surface during its early curing stage.
Christopher Alexander Ces Archive
Donations for the ongoing development of this Archive are gratefully accepted here DONATE
  • Christopher Alexander
  • Center for Environmental Structure
  • Publications
  • Projects
  • Works of Art
  • Construction Innovations
  • Academic
  • Scientific Research
  • Public Events

Contact us:

For information about the archive, please contact Artemis Anninou, Director of the project aanninou@outlook.com
Powered by
Copyright 2024 Center for Environmental Structure. All rights reserved. Distribution of any content on this website is expressly prohibited without prior written permission.
We use cookies to ensure that we give you the best experience on our website. If you click on “Yes” we will assume that you are happy with it.YesNo