C.E.S. Office – Martinez House: Photographs of the building
01/07/1986Three photographs of the building, viewed on the site together with the tile workshop and the small shed, and one of the tile workshop as seen from the entrance door of the office.
Content of
-
C.E.S. Office - Martinez House
1977 to
1984
The second building completed on the Martinez site, was a 2,000 square feet house. A gunite all-concrete building as well, it was the first sizable and fully functional project in which C.E.S. used gunite, while applying all permit and specification ...
-
Tile Glazing Workshop
1978 to
1981
The first building completed on the Martinez site, was an experimental gunite all-concrete building, with 200 square feet of floor area, concrete vaulted ceiling and concrete pitched roof. It was used as the tile glazing workshop, equipped with a kiln ...