C.E.S. Office – Martinez House: Photographs of the building
01/07/1986Four photographs of the building site, showing the relationships among the L-shaped office building, the tile workshop and the small experimental shed, which was finally removed.
Photograph:
- 1) The L-shaped office building at the back, with the tile workshop at the front
- 2) The L-shaped office building at the back, with the tile workshop at the left and the small shed at the right
- 3) View from the back of the site, the office building on the foreground, the ascending path and the workshop at the background
- 4) The tile workshop as seen from the entrance door of the office, through the colonnaded porch
Content of
-
C.E.S. Office - Martinez House
1977 to
1984
The second building completed on the Martinez site, was a 2,000 square feet house. A gunite all-concrete building as well, it was the first sizable and fully functional project in which C.E.S. used gunite, while applying all permit and specification ...
-
Tile Glazing Workshop
1978 to
1981
The first building completed on the Martinez site, was an experimental gunite all-concrete building, with 200 square feet of floor area, concrete vaulted ceiling and concrete pitched roof. It was used as the tile glazing workshop, equipped with a kiln ...