Construction Yard: Sprayed Concrete Building System – Photographs of mock-up
01/01/1977Three images depicting the three stages for the construction of mock-up comprising a sloped roof with a barrel-vault ceiling. The first image depicts the wood formwork set in place; the second image shows the wood formwork with reinforcing wire-mesh being placed in it, and the third one the completed, sprayed concrete wall and sloped roof with the vaulted ceiling.
Contents