House for Ann Medlock and John Graham: Photographs of the project during construction
01/01/1987Five boards with eleven images of window and door openings during the construction phase, overlaid with rough pencil sketches on tracing paper by Christopher Alexander, all showing the division of the framed openings with mullion designs.
Photograph:
- 1) Mullion divisions for the kitchen and 2nd bedroom windows
- 2) South facing office window and west facing kitchen and dining room windows
- 3) Living room bay window and west facing window
- 4) Main entrance door with side windows and living room east facing windows on either side of the fireplace
- 5) East facing bathroom and sauna room window β two design proposals
References
-
Design and Construction is one Integrated Making Process
The design process of a project and its construction process are united into one continuous and intertwined making process, unfolding in a step-by-step sequence. Design ends together with the completion of the construction process. "Making" is a conception of the ...
-
The Layout Process of Buildings on the Land - Visualization at Full Scale on Site
Each act of building needs to have a positive effect on its surroundings; to complete them, preserve their structure, make them better, by creating strong centers in them and next to them. Each new building is more alive when it ...