Martinez Carpentry Workshop: Photographs of drawings
01/01/1985
Drawing
Six drawings of the carpentry workshop.
Photograph:
1) Floor plan
2) Front elevation
3) Side elevation
4) Roof axonometric with details
5) Beam and column connection detail
6) Column and footing connection detail
Photographer:
Christopher Alexander/C.E.S., Martinez, CA, U.S.A.
Source:
PMT
Characteristics:
8 1/2"x11", B&W
Content of
Project
1 Items
Heavy Timber Carpentry Workshop
1985 to 1986
4207 Arthur Road, 94553, Martinez, CA, U.S.A.
Offices & Workshops, Realized, Construction completed in Apr-1986
Client:
Center for Environmetal Structure - C.E.S. Directors
C.E.S. staff:
Christopher Alexander, Gary Black, Seth Wachtel, Lance Dom
Contractor:
Center for Environmetal Structure
Project cost:
$50,000
Project stages:
Layout on the site by C.E.S. Design Development and Building Permit drawings done after layout Direct construction management and on-site design decisions Users involved in the construction Innovative construction methods
The third building completed on the Martinez site was a heavy timber carpentry workshop, 800 square feet of floor area, with 12"x12" columns and 8"x14" beams, specially engineered trusses and wood paneling. .