Martinez Tile Glazing Workshop: The first experimental all-gunite concrete building; construction of columns and beams – Photographs of 1st step
01/01/1979Nine photographs with close-ups, focusing on the details of the column and beam formworks which accommodate gunite requirements.
Photograph:
- 1) Detail of corner column and beam
- 2) Top view of corner beam
- 3) Detail of connection of middle column with beam
- 4) Another view of the previous detail
- 5) Top view of beam
- 6) Front view of column with the open part of its formwork
- 7) Corner column with vertical openings on its three sides
- 8) Detail of column base with bevels
- 9) Frieze detail above the beam
References
-
Martinez Tile Glazing Workshop: The first experimental all-gunite concrete building; construction of columns and beams - Photographs of 1st step
01/01/1979
Five photographs with overviews of the formwork for the columns and beams of the building, adapted to the requirements of the gunite method.
-
Martinez Tile Glazing Workshop: The first experimental all-gunite concrete building; construction of columns and beams - Photographs of 2nd step
01/01/1979
Eight photographs showing the setting up of the equipment for spraying the concrete, as well as the spraying of concrete in the formworks of columns and beams.
-
Martinez Tile Glazing Workshop: The first experimental all-gunite concrete building; construction of columns and beams - Photographs of 2nd step
01/01/1979
Ten photographs showing columns and beams with the shot-concrete already encased in the formworks, after excess concrete had been removed.