Neighborhood of Seventy Low Cost Houses: Reinforced concrete beam and column structure with brick infill – Photographs

01/05/1989
Working in Construction

Four images of the prototype house depicting the construction sequence: 1) Starting from the foundation and the initial steps of the brick wall layout before the pouring of the exterior columns; 2) Complreting the first-floor walls and the peripheral beams while prefabricating the interior, floor-beams and plaquetas, and 3) & 4) Laying out the interior beams and plaquetas for completing the second floor slab.