Eishin Campus – High School: Arts Building

1982 to 1985
Nihongi 112-1, Iruma-shi, Saitama Prefecture, Japan
Educational, Realized , Construction completed in 1985
The Arts buiding is located at the right side of the Central Hall, and shapes the end of the homebase street, echoing the homeroom buildings standing ahead of it, as one is walking along the homebase street.
Client:
Higashino High School - Hisae Hosoi, Managing Director
C.E.S. staff:
Christopher Alexander, Hans-Joachim Neis, Gary Black, Ingrid Fiksdahl-King
Contractor:
Fujita Corporation, Tokyo, Japan
Project stages:
Layout on the site by clients and C.E.S. Design Development and Construction Drawings done after layout Construction management along with on-site design decisions
Content of