30/04/1990Five subcontracts between the Center for Environmental Structure and 1) Blue Dolphin for the design and installation of the complete plumbing system, as well as the water appliances for the kitchen and bathrooms; 2) Bayside Roofing, for providing labor and materials for the installation of asphalt roof shingles, for building up the roof at the entry and for waterproofing two decks; 3) Erik Osborn for installing eighteen doors; hardware not included; 4) San Carlos Sheetmetal for providing specific materials and installing the heating system and sheet metal; 5) Statewide Contracting Services for wood siding, including repair works.
Contents
References
-
House for Gail Kaiser and Mark Anderton: Subcontract Proposal Request
17/01/1990
Two completed forms with explanatory drawings of subcontract proposals: 1) For a bow window, to finalize design with the architect, supply and install wood sashes and weatherproofing the opening; 2) For labor and material, for fabrication and installation of hinged ...
-
House for Gail Kaiser and Mark Anderton: Craftsman/Subcontractor Agreement
19/01/1990
Subcontract between the Center for Environmental Structure and 1) The Pacific Coast Insulation Co., Inc. to supply and install fiberglass batt insulation; 2) Steve Brewer for installing the electrical system.
-
House for Gail Kaiser and Mark Anderton: Craftsman/Subcontractor Agreement
08/04/1990
Subcontract between the Center for Environmental Structure and Scott Newkirk for the exterior painting of all exterior wood siding and trim, painting all exterior metal works, and clean up. Colors to be selected by the architect.