House for Gail Kaiser and Mark Anderton: Craftsman/Subcontractor Agreement
15/04/1991Subcontract between the Center for Environmental Structure and Bob Theis for labor on various exterior items listed in the job description attached: building an exterior table using an existing stool as base, a low wall and gate with redwood, repairing base of columns at kitchen yard, removing and replacing a post of the fence. Includes sketches with details.
References
-
House for Gail Kaiser and Mark Anderton: Subcontract Proposal Request
17/01/1990
Two completed forms with explanatory drawings of subcontract proposals: 1) For a bow window, to finalize design with the architect, supply and install wood sashes and weatherproofing the opening; 2) For labor and material, for fabrication and installation of hinged ...
-
House for Gail Kaiser and Mark Anderton: Craftsman/Subcontractor Agreement
19/01/1990
Subcontract between the Center for Environmental Structure and 1) The Pacific Coast Insulation Co., Inc. to supply and install fiberglass batt insulation; 2) Steve Brewer for installing the electrical system.
-
House for Gail Kaiser and Mark Anderton: Craftsman/Subcontractor Agreement
08/04/1990
Subcontract between the Center for Environmental Structure and Scott Newkirk for the exterior painting of all exterior wood siding and trim, painting all exterior metal works, and clean up. Colors to be selected by the architect.
SEE ALL Records