01/01/19815-page draft document listing the nine volumes of a construction manual, explaining the terms by which a construction operation could be included and describing the required information that each building operation must fill-out in special forms. Included are three additional handwritten pages, listing seven projects by the Center for Environmental Structure and their special construction elements.
References
-
Low Cost Houses for Mexicali
1975 to
1977
A cluster of houses for large families, with a builders yard, built by the families themselves with the help of students from the Universidad Autonoma of Mexico, and a team of builders from the Center for Environmental Structure. Each house ...
-
C.E.S. Office - Martinez House
1977 to
1984
The second building completed on the Martinez site, was a 2,000 square feet house. A gunite all-concrete building as well, it was the first sizable and fully functional project in which C.E.S. used gunite, while applying all permit and specification ...
-
House for Mr. and Mrs. Stuart Card
1979 to
1981
Two-story house, with outbuildings, terraceses and gardens.
SEE ALL Projects
-
Low Cost Houses for Mexicali: Construction operations
01/01/1976
40-page document outlines the twenty three construction steps of the Mexicali project, which illustrate the step-by-step construction process, and it is organized into ten major building operations. Each building operation includes the “Summary of Operation” chart, detailed drawings and description ...
-
C.E.S. Office - Martinez House: Octagonal freestanding concrete columns construction, with low-cost formwork
01/01/1981
Includes “Summary of Operation” chart, detailed drawings and description of the Octagonal Freestanding Column, in three variations. Used in the C.E.S. Office Construction Manual draft.
-
Berryessa Terraced House: Wooden post and beam, load bearing structural frame combined with sprayed concrete exterior walls
01/01/1981
8-page document outlines three important building operations of the project, namely the following: Pitched Concrete Roof, Post and Beam Wall with Concrete Exterior, and Concrete Column Base for Wooden Column. Each Building Operation includes the “Summary of Operation” chart and ...