Sullivan House: Extra Work Order for HB Electric
23/07/1991Subcontract tp replace electrical existing panel with a 12/24 panel including breaker work as well.
References
-
Sullivan House: Craftsman/Subcontractor Agreements
24/04/1991
Two subcontracts between Center for Environmental Structure and 1) Randy Schmidt for Entrance #2, providing labor and materials to install the front stoop extension, the brick path to sidewalk etc., as described in detail; 2) David Soffa for Entrance #3, ...
-
Sullivan House: Craftsman/Subcontractor Agreement
18/06/1991
Two subcontracts between Center for Environmental Structure and Nils Smith for 1) Entrance #4 demolition works, including a supportive structure, and subsequent removing of debris and cleaning; 2) Entrance #5 steel and timber framing works, including the removing of existing ...
-
Sullivan House: Craftsman/Subcontractor Agreement
25/07/1991
Three subcontracts between Center for Environmental Structure and Nils Smith for 1) Laundry #1 water supply, plumbing and gas installations, as well as drywall works; 2) Laundry #2 drywall and ceiling works as well as minor mechanical installations; 3) Entrance ...
SEE ALL Records