Bay Area Rapid Transit: Review of System Solutions

02/04/1964
Project Report

100-page report listing and analyzing design problems in the BART stations, organized in 73 related systems, with proposed solutions; it is followed by the list of the 390 requirements for the Transit Station, grouped as per the proposed systems .

Authors:
Christopher Alexander, College of Environmental Design, University of California Berkeley, Berkeley, CA, U.S.A.
References
SEE ALL Drawings