Civic Center and Town Hall for Mountain View: Preliminary Cost Estimate

09/09/1986
Engineering Report, Cost Data Report

29-page document titled “Cost Estimate and Area Tabulation” organized in the following three parts, after the consultant’s introductory letter: Area Tabulation; Cost Estimate Summaries; Cost estimate sheets. Two draft estimates are included.