Civic Center and Town Hall for Mountain View: Preliminary Cost Estimate
09/09/198629-page document titled “Cost Estimate and Area Tabulation” organized in the following three parts, after the consultant’s introductory letter: Area Tabulation; Cost Estimate Summaries; Cost estimate sheets. Two draft estimates are included.
                        References
                    
                                            
                        
                                            
                        - 
                                            
        
            
                
                    Civic Center and Town Hall for Mountain View: Cost estimate                
                                    
                        01/08/1986                                             
                                
            
            22-page document with estimates which try to offset the increased costs of numerous special building details in some areas, with proposals for much simpler construction and materials in other areas. Estimates given include site works and finish details, buildings and ...
 - 
                                            
        
            
                
                    Civic Center and Town Hall for Mountain View: Estimate summaries for cost and areas                
                                    
                        25/08/1986                                             
                                
            
            18-page handwritten draft summaries of costs and areas. Organized in two parts: 1. 14 pages with costs for the parking garage structure, cladding, interiors, services, miscellaneous and site; 2. 4 pages with the quantities for the square feet of horizontal ...
 

            
 Go Back