Civic Center and Town Hall for Mountain View: Preliminary Cost Estimate

09/09/1986
Engineering Report, Cost Data Report

30-page study includes: 1) An introductory letter indicating the content’s compliance with the competition conditions and specifications, calculated in accordance to the instructions provided by Christopher Alexander. It is a detailed take-off and estimate reflecting the drawings provided, with all the proposed unusual design elements and nonstandard construction techniques; 2) Area tabulation detailing quantities of areas of construction; 3) Cost Estimate Summaries; 4) Analytical cost estimate sheets, Two draft estimates are included.

Authors:
Christopher Alexander, Center for Environmental Structure, Berkeley, CA, U.S.A.
Duane Sample, Hanscomb Associates Inc., San Francisco, CA, U.S.A.