Frankfurt Parkstadt Project: Parkstadt Unterliederbach Frankfurt Hoechst Dossier II_Building Design

01/01/1995
Project Report

74-page report on the project design work until November 1995, consisting of urban design, models, plans and overall site and apartment plans; 1:20 metric model studies with building sections; study of brickwork of Peter Behrens main Hoechst office building; apartment archetypes and prototypes; urban model studies (urban design); area take-offs and calculations; rough cost estimates 3-Nov-1995; user designs of apartment plans, with models; rules to determine the distance between buildings; environment and bioclimatic data; summary of August 1995 design decisions; open questions.

References
SEE ALL Reports