Low Cost Houses for Mexicali: Construction Operations

01/05/1976
Project Report

253-page draft report organized in six sections dealing with: 1. Construction system – where focus is place on an example of arcades between houses; 2. Daily notes – meeting minutes per day; 3. Construction operations – laying out the whole construction process and the techniques to be used; 4. Control operations – setting the methods of controlling and distributing materials and tools – including specific forms to be filled out by each family as for material needed and tools to be used.

Authors:
Howard Davis, Julio Martinez, Center for Environmental Structure, Berkeley, CA, U.S.A.