Moshav Shorashim: Proposal for the Planning and Construction of an Industrial Cooperative Village
01/01/1977The proposal includes the following: Introduction, Concept, Connection with the Stated Goals of the Jewish Agency, Phases of Work, Schedule, Budget.
References
-
Master Planning as a Dynamic Process - Organic Order and Piecemeal Growth
It is simply not possible to fix today, in a Master Plan, what the environment should be like in the future, and then to steer the piecemeal process of development toward that fixed, imaginary world. Instead, planning and construction will ...
-
Dynamics of a Growing Neighborhood - Rules and Patterns for Laying out a Neighborhood
Neighborhoods and communities grow and change over time, and the effect of time on the process of its adaptation on real needs is huge, and leads to types and styles of order quite different from any planned arrangement, based on ...
-
Master Plan for Sergev H: to be built in the Segev region of Galilee
01/01/1979
166-page report on the Master Plan for a new industrial moshav, a type of cooperative in Israel. Unlike other master plans, it describes the life, the dynamic relationship between people and the environment, growth over time and is a prescription ...
-
Moshav Shorashim: Handbook for House Design
01/01/1982
71-page document, which outines the process for the house layout process on site by the families under the guidance of C.E.S. staff. It has three parts; Part I. Centers; Part II. The Rules; Part III. The Detailed Layout of the ...
-
Moshav Shorashim: Handbook for House Design
01/01/1982
The original report, a 45-page document, on the process for the house layout process on site by the families under the guidance of C.E.S. staff, in three parts; Part I. Centers; Part II. The Rules; Part III. The Detailed Layout ...