New Eishin University: Memorandum of Agreement (A) & Memorandum of Agreement (B)
16/08/1984Two 5-page signed memoranda. Memorandum (A) declares the Center for Environmental Structure as participant constructor, in cooperation with the Fujita Kogyo construction company and Mr. Hansjoachim Neis as the C.E.S. representative. Memorandum (B) is an addendum to the original Contract of 6-May-1982, and determines the arrangements for the construction of the school for the next 9 months and until the end of construction phase 1.
Contents
References
-
New Eishin University: Contract
06/05/1982
7-page design contract between the School Foundation Eishin Gakuen and the Center for Environmental Structure for designing new school buildings on a 70,000 m² site. Buildings included are: 1) new high school of 6,600 m2 for 1,200 students, 2) new ...
-
New Eishin University: Addendum to the Contractual of 06-May-1982
28/02/1984
Contractual addendum between Gakko Hojin Eishin Gakuento and the Center for Environmental Structure, agreeing to review the costs incurred by any exceptional delays in the schedule of design work, as explained by the 15-Jan-1984 Memorandum .
-
New Eishin University: Agreement between the Eishin School and the Center for Environmental Structure
09/08/1985
2-page document with seven paragraphs of agreements relating to interior finishes of the Great Hall such as the screen and plastering works, a new contract for money needed for the plastering works and the obligation of the C.E.S. to cooperate ...