Arch 209, Spring 1974 – On construction: Student paper on the Etna Street building project
01/01/197310-page student paper reflecting on the process of building the Etna Street Cottage following a construction pattern language. An attempt to formulate the aspects of the followed process which were successful and those that failed the objectives of the experiment.
References
-
Etna street Cottage: Photographs of the layout process
01/01/1974
Two images depicting the initial step of staking out the position of the cottage on the lot.
-
Etna street Cottage: Photographs of people during construction
2 2) Christopher Alexander while pouring the slab
01/01/1974
Five images showing people performing various activities in order to prepare the ground floor slab for pouring concrete.
-
Etna street Cottage: Photographs of people during construction
3 3) Pouring and leveling the second floor light weight concrete slab
01/01/1974
Three images depicting the completion of light weight concrete works on the top of the first floor vaulted ceiling and arched alcove. Christopher Alexander and students involved with the project are in the pictures.