The Julian Street Inn – Shelter for the Homeless: Cost-free clarifications for residential building – Roof & floor sheathing

15/08/1988
Construction Works, Clarifications

Two construction clarifications specifying: 1) The changes in the construction of the 2nd story floor decking; 2) The removal of the 2×4 unnecessary blocking between trusses.

Authors:
Christopher Alexander, Gary Black, Center for Environmental Structure, Berkeley, CA, U.S.A.
References