The Julian Street Inn – Shelter for the Homeless: Contract Specifications
01/01/1986Two drafts of specifications organized by divisions and sections; the first 6-page draft includes nine divisions on general requirements, siteworks, materials, installation information etc., and the second 9-page draft continues with Division 9 – Finishes and concludes with Division 16 – Electrical.
Contents
References
-
The Julian Street Inn - Shelter for the Homeless: Contract Specifications - Change Order Form
17/08/1987
22 pages of edited Contract Specifications with changes requested by owner; the changes refer to the following eleven Divisions: Division 1 – General Requirements; Division 2 – Sitework; Division 3 – Concrete; Division 4 – Masonry; Division 5 – Miscellaneous ...
-
The Julian Street Inn - Shelter for the Homeless: Specifications
01/01/1987
19 pages defining the work to be done by the architect in connection to the set of drawings already supplied. It includes the following specifications: 1) Excavation and sitework; 2) Foundations and slabs; 3) Precast panels; 4) Columns and beams; ...