The Julian Street Inn – Shelter for the Homeless: Construction experiments for testing the prefabrication of wall-segment tile panels and lifting them in place – Technical study

01/01/1988
Construction Experiment & Mock-up, Calculations

12-page draft study on the technical and structural requirements for the lifting process of the prefabricated wall-segment tile panels, and three pages with notes on the panel erecting and lifting-hardware .

Record: