建築のプロセス ハンスヨアヒム. ナイス / Architecture Process of Eishin Campus
01/06/1985
References
-
Eishin Campus - High School
1982 to
1995
The High School is the part of the Eishin Campus that was constructed, with a total construction area of 12,000 square meters. It is a complex of thirty-five buildings, with pedestrian colonnaded streets, gates and gardens, and a lake with ...
-
Eishin Campus - High School: Central Hall
1982 to
1985
The Central Hall is located at the end of the homebase street. Α student gathering area with four-foot-thick concrete base walls and arched openings, with built-in benches, which double as entrances to the building. Arches and seats form alcoves, and ...
-
Eishin Campus - High School: Great Hall - Auditorium
1982 to
1986
A large ceremonial building located at the main square and forming one edge of the lake. The main bridge that crosses the lake starts next to its massive podium. Its floor area is 14,000 square feet and has a three-story ...