Rapid Transit Stations for the Bay Area Rapid Transit System: Preliminary Design Drawings

23/06/1964
Architectural Design, Preliminary Design, Diagrams, Details, Notes

System 9 – “Sound and Air Movement Control at the Barrier” specifies the controls required at the platform’s edge to isolate tunnel noise, air movement and drift, proposing methods to alleviate the cavernous feeling that is created in enclosed subterranean spaces.

Designers:
Christopher Alexander, Van Maren King, Sara Ishikawa, Berkeley, CA, U.S.A.
Medium:
Blueprint
Size:
10 3/4"x22 3/4"