The Julian Street Inn – Shelter for the Homeless: Construction Drawings – Change Order #1

16/02/1988
Architectural Design, Construction Drawings, Details

Change order drawing regarding the construction of partition walls with a structural rating 50, as illustrated in two wall section details, one vertical and one horizontal, with notes and specifications.

Designers:
Christopher Alexander, Gary Black, James Maguire, Eleni Coromvli, Berkeley, CA, U.S.A.
Medium:
Original on Tracing Paper
Size:
8 1/2"x11"
Scale:
1 1/2"=1'