The Campus of Eishin – High SchooI: Photographs of the pedestrian network of the campus and the Homebase street
01/05/1985Homebase street, on the first day of its use during a school gathering, just after the first stage of construction was completed; at that point the terraces and small gardens along the street had not yet been built.
The photo was exhibited at the 14th International Architecture Biennale Exhibition: “Office US”.
Content of
-
Eishin Campus - High School
1982 to
1995
The High School is the part of the Eishin Campus that was constructed, with a total construction area of 12,000 square meters. It is a complex of thirty-five buildings, with pedestrian colonnaded streets, gates and gardens, and a lake with ...
-
Eishin Campus - High School: Campus Pedestrian Streets Network
1986 to
1989
The Eishin Campus pedestrian network includes a main square connected to the homebase wide street, narrow streets, arcaded alleys, paths and courtyards, fences, gates and terraces. It starts with a small square in front of the small gate, continues with ...
References
-
The Campus of Eishin - High SchooI: Photographs of the pedestrian network of the campus and the Homebase street
8 8) Walking down the homebase street towards the square, one faces the Great Hall
01/01/1986
Eight views of the Homebase street, when the construction of the terraces stepping up from the main square with the Great Hall all the way to its end where the Central Building stands was completed. The terraces were formed by ...
-
The Campus of Eishin - High SchooI: Photographs of the pedestrian network of the campus and the Homebase street
4 4) Close-up of the entrance wall and gate
01/12/1989
Four views of the Homebase street, a few years after it was completed and the terraces got their final shape with the bushes, grass and trees planted .